
Directions: How to get Here
Range is located @
4520 38th ST SE, Everett WA 98205
Directions all start with exiting onto the 'Hewitt Avenue trestle' known as US Highway 2.
From the East (Highway 9)
Get on Highway 2 headed west on the trestle. There is a LEFT side exit from the trestle close to where Hwy 204 enters Hwy 2. Take the Homeacres Road exit down to a service road located below the trestle. At the first stop sign, turn left. There is another stop sign immediately after the first. Proceed straight ahead (south). The road will curve 90 degrees to the right (west). About 1/4 mile later the road turns 90 degrees to the left (south). After travelling approximately one mile, turn left onto 38th Street SE. The intersection is marked with a range sign. The range is located about 200 yards east on the right, beyond a well marked gate.
From the West (Interstate 5)
Take Highway 2 onto the trestle. Travel about ¾ mile, then take the right exit onto Homeacres road. Go straight at the first stop sign; turn right at the second. The road will curve 90 degrees to the right (west). About 1/4 mile later the road turns 90 degrees to the left (south). After travelling approximately one mile, turn left onto 38th Street SE. The intersection is marked with a range sign. The range is located about 200 yards east on the right, beyond a well marked gate.
Remember to keep your firearms in your vehicle until you check in with the Range Master, and in no case is there to be any firearms handling during a cease fire. When the range is 'hot', and only then, you may bring one firearm at a time from your vehicle. With the action open and the muzzle pointed up, proceed to the firing line.

